* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67293Weather Stripping (1)5971Roof Beam Bracket (4)66382Lower Door Guide (4)66183Roof Trim Cap(2
Parts List V1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 3719 Door Handle Brace 2 2 8200 Wall Pane
13Assembly by Key No.A13112222334455667788889910111212121212121313141415161717171718181919202021212222232424242424242424252526262626272727272829303031
The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will
Step 2A1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at th
16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th
17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)66769S
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5A18The floor frame must b
1 Position a corner panel at thecorner of the floor frame as shown.The widest part of each corner panelmust be placed along the side of thebuilding f
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
The main frame pieces give rigidity tothe side walls and provide a surfacefor attaching the gables which sup-port the roof.1 Fasten the rear wall ang
Step 8V21● Parts Needed For ●Wall Panels●●●●● 8200 Wall Panel (4)●●●●● 6627 Wall Panel (4)The wall panels come in two widths.Each wall panel has a cri
●●●●● 9370 Door Jamb (2)●●●●● 9365 Front Wall Channel (2)● Parts Needed For ●Front Channel/Door JambStep 9U22The door jambs reinforce the dooropening
23The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece
● Parts Needed For ●Gables/BracesStep 11A24●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● 6635 Gable Brace (2)241 Lift and fast
25Step 12A25● Parts Needed For ●Roof Beams●●●●● Main Roof Beam (1)●●●●● Single Roof Beam (2)1 Spread the two halves of the mainroof beam and fasten th
26Step 13A26● Parts Needed For ●Right Roof Panel●●●●● 8468 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin insta
1 Install a left roof panel at the leftrear and right front corner of the roof.Install a right roof panel at the leftfront corner of the roof.3 Instal
28Step 15A28● Parts Needed For ●Ridge Caps & Panels●●●●● 8840 Ridge Cap (1)●●●●● 7483 Roof Panel (2)●●●●● 8486 Ridge Cap (1)1 Install the first ri
1 Attach the right and left side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.NOTEA si
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
30●●●●● 3719 Door Handle Brace (2)●●●●● 10477 Right and Left Doors (2)●●●●● 10497 Horizontal Door Brace (4)●●●●● 6300 Vertical Door Brace (2)● Par
31Step 18A31● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building,
10193 510192 210196 210193 10193 101931019310193101931019210192101921019210194101941019610196Assembly ManualFB109-A 697.68385-A
1. Before assembling this kit, the floor frames packed with the building must be assembled.• Vor dem Zusammenbau dieses Bausatzesmüssen die mit dem G
10 x 7, 10 x 8, 10 x 9 & 10 x 104. Frame must be square and level.• Montieren Sie über lappende Teile.• Ensamble las piezas que solapan.• Assemb
Installing Plywood8 x 8Sheet #322 1/8“x 87 3/4”Sheet #148“ x 87 3/4”Platte 1 * Hoja núm. 1* Panneau no 1121.9 cm x 222.9 cmSheet #248“ x 87 3/4”Platt
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 c
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWASLEFTBLANKINTENTIONALLY8
The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation A09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRA
Kommentare zu diesen Handbüchern