* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
The rear roof channel assembliesattach to the permanent structureand support the unit.1 Fasten the channel braces to theend of the left & right re
The anchor brackets in this step willbe used later to anchor the unit to thebase/foundation.1 Position an anchor bracket in-side the left, center &
Step 3BL12● Parts Needed For ●Mounting Rear RoofChannels to Structure1 Positioning The height from the bottom of post to the bottom of rear roof chann
Step 3 continued...BL133 Attaching It is important that the rear roof channels be securely anchored to a sound and flat mountingsurface. A special mo
Step 4BL14● Parts Needed For ● Roof ChannelAssembly14Get help holding post in place whileattaching the roof channel.1 Position a roof channel, with sm
Step 4 continued...BL1515STEP3STEP496569660 Right Post9660 Right Post1 1/8"96569671 Center Post1 1/8" (2,9 cm)1 1/8"(2,9 cm) (2,9 cm)
1 Place right and left facia overfront roof channels with largestamount of holes on top. Butt togetherand fasten bottom flange with ten#10Ax 3/8"
Step 6BL17● Parts Needed For ●Corner/Front SpliceTrim●●●●● 9670 Corner Trim (four)●●●●● 9669 Front Splice Trim (three)171 Fasten front splice trim to
2 Fasten top of right roof panelusing two #10-32x7/16" (11 mm) boltsand square nuts into bottom flange,on rear roof channel. Fasten bottomof pan
Step 7 continued...BO1919Do not fasten until next stepSTEP3STEP4STEP5STEP2#10-32x3/4"(19 mm) Bolt #10-32 Well-Nut2x4(38 mm x 89 mm)2x4ENDVI
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
Step 8BL20● Parts Needed For ●Top Left and RightEnd Trim●●●●● 9667 Top Left End Trim (one)●●●●● 9668 Top Right End Trim (one)201 Fasten top right end
Step 9BL21● Parts Needed For ●Top Front Trim1 Position top front trim to ends ofroof panels, overlapping top left endtrim and fasten using five #10 sc
Step 10 Leveling and Anchoring PostsBO22Check to be sure front facia and rearroof channel are still square. Leveleach post. Stand at one end andvis
If the locality where you have installed thepatio cover/carport could benefit from a gut-tering system, we recommend the followinglist of materials, (
PC1020 BL241. Avoid nicking or scraping the coating surface,inside and out.2. Keep roof and post perimeter free of debris andleaves which may acc
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your unit. The best location is a level area with good d
4Safety precautions are important to follow throughout the construction of your patio cover/carport•Care must be taken when handling variouspieces of
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
Concrete SlabLevelWood FrameMin. 249"(632,5 cm)Concrete FootingEarthFoundation Recommendations BL06The Foundation For Your Patio Cover/CarportN
Hardware BL0766623#10Ax3/8" (10 mm)Screw (96)664333/8-16 Hex Nut (3)7666293/8-16x3 1/4" (83 mm)Hex Hd Bolt (3)66625#10-32x3/4"(19 m
Parts in Carton One Assembly Part Part Quantity Check Key No. Number Description in Carton List 1 9654 Right Facia 2 2 9657 Left Fac
Assembly by Key No. BL099