Arrow VT1231 Bedienerhandbuch Seite 15

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 43
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 14
The gables go on top of the front and
rear walls to support the roof beams.
The gables are packed nested to-
gether and might be mistaken as 1
piece. Carefully separate them be-
fore continuing.
1 Position mid and outer gable
braces on right and left gables.
Short mounting flange of brace must
face center of gable. Fasten using
#10-32x7/16" bolts, washers and
square nuts. Assemble 2 sets of
gables.
Step 2
BW15
Parts Needed For
Gables All Sizes
6381 Mid Gable Brace (4)
6380 Outer Gable Brace (4)
7942 Right Gable (2)
7943 Left Gable (2)
15
7912
#10-32 Square Nut
#10-32x7/16" Bolt
10462
Short Mounting Flange
Must Face Towards
Center of Gable
Step 3
Parts Needed For
Roof Beam Assemblies
10462 Roof Beam (2) (All Sizes)
7912 Roof Beam (2) (1217)
7912 Roof Beam (4) (1224)
7912 Roof Beam (6) (1231)
The roof beams join the gables to the
truss and supports the roof panels.
1Align the holes on 2 roof beams,
back-to-back and fasten using 4 #10-
32x7/16" bolts and square nuts.
Small Holes
on Top
7942
7943
6380
6381
#10-32x7/16" Bolt
#10-32 Square Nut
Washer
FRONT
Assembled
End
View
Seitenansicht 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 42 43

Kommentare zu diesen Handbüchern

Keine Kommentare